## Description
- TokensAccessor improvement. The dependence on default values has been
removed, now what we pass to the input is what we get at the output.
- The themes are placed in a separate class and added tagging for it.
- The theme settings in storybook have been moved to the panel, color
input from the keyboard is now available
- The Chroma is controlled only for non achromatic colors.
## Type of change
> Please delete options that are not relevant.
- Chore (housekeeping or task changes that don't impact user perception)
## How Has This Been Tested?
- Manual
## Checklist:
### Dev activity
- [x] My code follows the style guidelines of this project
- [x] I have performed a self-review of my own code
- [x] I have commented my code, particularly in hard-to-understand areas
- [ ] I have made corresponding changes to the documentation
- [x] My changes generate no new warnings
- [ ] I have added tests that prove my fix is effective or that my
feature works
- [x] New and existing unit tests pass locally with my changes
- [ ] PR is being merged under a feature flag
---------
Co-authored-by: Valera Melnikov <melnikov.vv@greendatasoft.ru>
Fixes#21920Fixes#21925
## Type of change
- Chore
## How Has This Been Tested?
- Manual
### Test Plan
> Add Testsmith test cases links that relate to this PR
### Issues raised during DP testing
> Link issues raised during DP testing for better visiblity and tracking
(copy link from comments dropped on this PR)
## Checklist:
### Dev activity
- [ ] My code follows the style guidelines of this project
- [ ] I have performed a self-review of my own code
- [ ] I have commented my code, particularly in hard-to-understand areas
- [ ] I have made corresponding changes to the documentation
- [ ] My changes generate no new warnings
- [ ] I have added tests that prove my fix is effective or that my
feature works
- [ ] New and existing unit tests pass locally with my changes
- [ ] PR is being merged under a feature flag
### QA activity:
- [ ] Test plan has been approved by relevant developers
- [ ] Test plan has been peer reviewed by QA
- [ ] Cypress test cases have been added and approved by either SDET or
manual QA
- [ ] Organized project review call with relevant stakeholders after
Round 1/2 of QA
- [ ] Added Test Plan Approved label after reveiwing all Cypress test