Commit Graph

12 Commits

Author SHA1 Message Date
ashit-rath
59d0f999ad
chore: route builder refactor (#27905)
## Description
This PR aims to achieve 2 things
1. Make route building independent of explicitly passing `pageId` as
param when the route is generated against the current page navigation.
2. Add extensible points to extend basePath generation in EE.

THIS PR DOES NOT CHANGE ROUTE GENERATION. 

Changes: 
In `app/client/src/ce/entities/URLRedirect/URLAssembly.ts`
1. Moves the logic of `generateBasePath` way to specific method called
`generateBasePathForApps` and the generateBasePath is available to
extend and switch between a different base path generation logic in EE.
2. Adds a new member variable called `currentPageId`. This
`currentPageId` would help generating basePath without explicitly
passing `pageId` to the build method. If a `pageId` is passed it would
be overridden in the `resolveEntityId` logic.
3. Added `resolveEntityId` method to resolve the entity (pageId) based
on the params passed and the `currentPageId`. This method also acts as
an extension point for extending the logic to any other resolution logic
similar to `generateBasePath`

In `app/client/src/pages/AppViewer/index.tsx` and
`app/client/src/pages/Editor/index.tsx`
The `currentPageId` is set using the `urlBuilder.setCurrentPageId` when
the component mounts or page changes and unset when the component
unmounts.


#### PR fixes following issue(s)
Fixes #27840 

#### Media
> A video or a GIF is preferred. when using Loom, don’t embed because it
looks like it’s a GIF. instead, just link to the video
>
>
#### Type of change
- Chore (housekeeping or task changes that don't impact user perception)

## Testing
>
#### How Has This Been Tested?
> Please describe the tests that you ran to verify your changes. Also
list any relevant details for your test configuration.
> Delete anything that is not relevant
- [x] Manual
- [ ] JUnit
- [x] Jest
- [ ] Cypress
>
>
#### Test Plan
> Add Testsmith test cases links that relate to this PR
>
>
#### Issues raised during DP testing
> Link issues raised during DP testing for better visiblity and tracking
(copy link from comments dropped on this PR)
>
>
>
## Checklist:
#### Dev activity
- [x] My code follows the style guidelines of this project
- [x] I have performed a self-review of my own code
- [x] I have commented my code, particularly in hard-to-understand areas
- [ ] I have made corresponding changes to the documentation
- [x] My changes generate no new warnings
- [x] I have added tests that prove my fix is effective or that my
feature works
- [x] New and existing unit tests pass locally with my changes
- [ ] PR is being merged under a feature flag


#### QA activity:
- [ ] [Speedbreak
features](https://github.com/appsmithorg/TestSmith/wiki/Guidelines-for-test-plans#speedbreakers-)
have been covered
- [ ] Test plan covers all impacted features and [areas of
interest](https://github.com/appsmithorg/TestSmith/wiki/Guidelines-for-test-plans#areas-of-interest-)
- [ ] Test plan has been peer reviewed by project stakeholders and other
QA members
- [ ] Manually tested functionality on DP
- [ ] We had an implementation alignment call with stakeholders post QA
Round 2
- [ ] Cypress test cases have been added and approved by SDET/manual QA
- [ ] Added `Test Plan Approved` label after Cypress tests were reviewed
- [ ] Added `Test Plan Approved` label after JUnit tests were reviewed
2023-10-12 11:01:22 +05:30
Valera Melnikov
9eac55a380
chore: add consistent-type-definitions rule (#27907)
## Description
Add consistent-type-definitions rule
2023-10-11 10:35:24 +03:00
Valera Melnikov
f5a0e41f60
chore: update eslint and dependencies then fix revealed errors (#27908)
## Description
Update eslint and dependencies then fix revealed errors
2023-10-11 10:14:38 +03:00
ChandanBalajiBP
317dae4479
feat: Connection pooling CE (#27328)
Co-authored-by: Ayush Pahwa <ayushpahwa96@gmail.com>
Co-authored-by: Ayush Pahwa <ayush@appsmith.com>
Co-authored-by: Ankita Kinger <ankita@appsmith.com>
2023-10-10 14:54:28 +05:30
Valera Melnikov
fb12f6ad87
chore:add eslint rules (#27878)
Add eslint rules
- promise-function-async
- prefer-nullish-coalescing
2023-10-09 16:54:06 +03:00
Dipyaman Biswas
6c0dc2e89f
feat: code split files based on feature flags (#27678)
## Description
Add feature flag based logic for code splitted files

#### PR fixes following issue(s)
Fixes #2237 

#### Type of change

- New feature (non-breaking change which adds functionality)
- Breaking change (fix or feature that would cause existing
functionality to not work as expected)


## Testing
>
#### How Has This Been Tested?
> Please describe the tests that you ran to verify your changes. Also
list any relevant details for your test configuration.
> Delete anything that is not relevant
- [x] Manual
- [ ] JUnit
- [ ] Jest
- [x] Cypress
>
>
#### Test Plan
> Add Testsmith test cases links that relate to this PR
>
>
#### Issues raised during DP testing
> Link issues raised during DP testing for better visiblity and tracking
(copy link from comments dropped on this PR)
>
>
>
## Checklist:
#### Dev activity
- [ ] My code follows the style guidelines of this project
- [ ] I have performed a self-review of my own code
- [ ] I have commented my code, particularly in hard-to-understand areas
- [ ] I have made corresponding changes to the documentation
- [ ] My changes generate no new warnings
- [ ] I have added tests that prove my fix is effective or that my
feature works
- [ ] New and existing unit tests pass locally with my changes
- [ ] PR is being merged under a feature flag


#### QA activity:
- [ ] [Speedbreak
features](https://github.com/appsmithorg/TestSmith/wiki/Guidelines-for-test-plans#speedbreakers-)
have been covered
- [ ] Test plan covers all impacted features and [areas of
interest](https://github.com/appsmithorg/TestSmith/wiki/Guidelines-for-test-plans#areas-of-interest-)
- [ ] Test plan has been peer reviewed by project stakeholders and other
QA members
- [ ] Manually tested functionality on DP
- [ ] We had an implementation alignment call with stakeholders post QA
Round 2
- [ ] Cypress test cases have been added and approved by SDET/manual QA
- [ ] Added `Test Plan Approved` label after Cypress tests were reviewed
- [ ] Added `Test Plan Approved` label after JUnit tests were reviewed
2023-09-30 02:12:56 +05:30
albinAppsmith
18fcd09e07
fix: Active color of primary buttons broken after ADS 2.0 migration (#26958)
## Description

When admin has configured the branding color, on click of primary
button, still appsmith orange color was being rendered. This PR fixes
that issue and also added a fallback to handle the old customers who
already have a branding color. This fallback is required since the new
fix work only for people who choose brand color after this PR is merged.

Corresponding EE PR:
https://github.com/appsmithorg/appsmith-ee/pull/2182

#### PR fixes following issue(s)
Fixes #25446 
Fixes #27501

#### Type of change

- Bug fix (non-breaking change which fixes an issue)

## Testing
>
#### How Has This Been Tested?
> Please describe the tests that you ran to verify your changes. Also
list any relevant details for your test configuration.
> Delete anything that is not relevant
- [x] Manual
- [ ] JUnit
- [ ] Jest
- [ ] Cypress
>
>
#### Test Plan
> Add Testsmith test cases links that relate to this PR
>
>
#### Issues raised during DP testing
> Link issues raised during DP testing for better visiblity and tracking
(copy link from comments dropped on this PR)
>
>
>
## Checklist:
#### Dev activity
- [ ] My code follows the style guidelines of this project
- [ ] I have performed a self-review of my own code
- [ ] I have commented my code, particularly in hard-to-understand areas
- [ ] I have made corresponding changes to the documentation
- [ ] My changes generate no new warnings
- [ ] I have added tests that prove my fix is effective or that my
feature works
- [ ] New and existing unit tests pass locally with my changes
- [ ] PR is being merged under a feature flag


#### QA activity:
- [ ] [Speedbreak
features](https://github.com/appsmithorg/TestSmith/wiki/Guidelines-for-test-plans#speedbreakers-)
have been covered
- [ ] Test plan covers all impacted features and [areas of
interest](https://github.com/appsmithorg/TestSmith/wiki/Guidelines-for-test-plans#areas-of-interest-)
- [ ] Test plan has been peer reviewed by project stakeholders and other
QA members
- [x] Manually tested functionality on DP
- [ ] We had an implementation alignment call with stakeholders post QA
Round 2
- [ ] Cypress test cases have been added and approved by SDET/manual QA
- [ ] Added `Test Plan Approved` label after Cypress tests were reviewed
- [ ] Added `Test Plan Approved` label after JUnit tests were reviewed

---------

Co-authored-by: Pawan Kumar <pawan.stardust@gmail.com>
2023-09-21 15:37:41 +05:30
Ankita Kinger
e385b50ce0
chore: Removing styles from instance admin emails to avoid keeping it a scrollable input (#27474)
## Description

Removing styles from instance admin emails to avoid keeping it a
scrollable input

#### PR fixes following issue(s)
Fixes # (issue number)

#### Type of change
- Chore (housekeeping or task changes that don't impact user perception)

## Testing

#### How Has This Been Tested?
- [x] Manual
- [ ] JUnit
- [ ] Jest
- [ ] Cypress

## Checklist:
#### Dev activity
- [x] My code follows the style guidelines of this project
- [x] I have performed a self-review of my own code
- [x] I have commented my code, particularly in hard-to-understand areas
- [ ] I have made corresponding changes to the documentation
- [x] My changes generate no new warnings
- [ ] I have added tests that prove my fix is effective or that my
feature works
- [x] New and existing unit tests pass locally with my changes
- [ ] PR is being merged under a feature flag


#### QA activity:
- [ ] [Speedbreak
features](https://github.com/appsmithorg/TestSmith/wiki/Guidelines-for-test-plans#speedbreakers-)
have been covered
- [ ] Test plan covers all impacted features and [areas of
interest](https://github.com/appsmithorg/TestSmith/wiki/Guidelines-for-test-plans#areas-of-interest-)
- [ ] Test plan has been peer reviewed by project stakeholders and other
QA members
- [ ] Manually tested functionality on DP
- [ ] We had an implementation alignment call with stakeholders post QA
Round 2
- [ ] Cypress test cases have been added and approved by SDET/manual QA
- [ ] Added `Test Plan Approved` label after Cypress tests were reviewed
- [ ] Added `Test Plan Approved` label after JUnit tests were reviewed
2023-09-20 15:14:48 +05:30
Ankita Kinger
1c7cca908c
chore: Updating instance admin emails input field to tag input field for better UX (#27410)
## Description

Updating instance admin emails input field to tag input field for better
UX

#### PR fixes following issue(s)
Fixes [#27418](https://github.com/appsmithorg/appsmith/issues/27418)

#### Type of change
- Chore (housekeeping or task changes that don't impact user perception)

## Testing

#### How Has This Been Tested?
- [x] Manual
- [ ] JUnit
- [ ] Jest
- [ ] Cypress

## Checklist:
#### Dev activity
- [x] My code follows the style guidelines of this project
- [x] I have performed a self-review of my own code
- [x] I have commented my code, particularly in hard-to-understand areas
- [ ] I have made corresponding changes to the documentation
- [x] My changes generate no new warnings
- [ ] I have added tests that prove my fix is effective or that my
feature works
- [x] New and existing unit tests pass locally with my changes
- [ ] PR is being merged under a feature flag


#### QA activity:
- [ ] [Speedbreak
features](https://github.com/appsmithorg/TestSmith/wiki/Guidelines-for-test-plans#speedbreakers-)
have been covered
- [ ] Test plan covers all impacted features and [areas of
interest](https://github.com/appsmithorg/TestSmith/wiki/Guidelines-for-test-plans#areas-of-interest-)
- [ ] Test plan has been peer reviewed by project stakeholders and other
QA members
- [ ] Manually tested functionality on DP
- [ ] We had an implementation alignment call with stakeholders post QA
Round 2
- [ ] Cypress test cases have been added and approved by SDET/manual QA
- [ ] Added `Test Plan Approved` label after Cypress tests were reviewed
- [ ] Added `Test Plan Approved` label after JUnit tests were reviewed
2023-09-19 11:54:43 +05:30
Ankita Kinger
5e6dd189fd
chore: Updating link component props (#27223)
## Description

Updating existing link component usage to use the correct props and
remove `e.preventDefault()` when not required, as we have updated the DS
Link component implementation

#### PR fixes following issue(s)
Fixes [#583](https://github.com/appsmithorg/design-system/issues/583)

#### Type of change
- Chore (housekeeping or task changes that don't impact user perception)

## Testing

#### How Has This Been Tested?
- [x] Manual
- [ ] JUnit
- [ ] Jest
- [x] Cypress

## Checklist:
#### Dev activity
- [x] My code follows the style guidelines of this project
- [x] I have performed a self-review of my own code
- [x] I have commented my code, particularly in hard-to-understand areas
- [ ] I have made corresponding changes to the documentation
- [x] My changes generate no new warnings
- [ ] I have added tests that prove my fix is effective or that my
feature works
- [x] New and existing unit tests pass locally with my changes
- [ ] PR is being merged under a feature flag


#### QA activity:
- [ ] [Speedbreak
features](https://github.com/appsmithorg/TestSmith/wiki/Guidelines-for-test-plans#speedbreakers-)
have been covered
- [ ] Test plan covers all impacted features and [areas of
interest](https://github.com/appsmithorg/TestSmith/wiki/Guidelines-for-test-plans#areas-of-interest-)
- [ ] Test plan has been peer reviewed by project stakeholders and other
QA members
- [ ] Manually tested functionality on DP
- [ ] We had an implementation alignment call with stakeholders post QA
Round 2
- [ ] Cypress test cases have been added and approved by SDET/manual QA
- [ ] Added `Test Plan Approved` label after Cypress tests were reviewed
- [ ] Added `Test Plan Approved` label after JUnit tests were reviewed
2023-09-14 16:14:23 +05:30
Ankita Kinger
bb2bf36481
fix: App card layout shifting & dropdown options for longer labels (#26722)
## Description

Fixing:
- App cards layout shifting on Firefox browser
- Dropdown options for longer labels not showing ellipsis
- On leave workspace, the page should not reload. Flow should be same as
delete workspace action
- Remove tooktip on loader workspaces on left pane.

#### PR fixes following issue(s)
Fixes [#16706](https://github.com/appsmithorg/appsmith/issues/16706)
[#16873](https://github.com/appsmithorg/appsmith/issues/16873)
[#16416](https://github.com/appsmithorg/appsmith/issues/16416)
[#24736](https://github.com/appsmithorg/appsmith/issues/24736)

#### Type of change
- Bug fix (non-breaking change which fixes an issue)

## Testing

#### How Has This Been Tested?
- [ x] Manual
- [ ] JUnit
- [ ] Jest
- [ ] Cypress

## Checklist:
#### Dev activity
- [x] My code follows the style guidelines of this project
- [x] I have performed a self-review of my own code
- [x] I have commented my code, particularly in hard-to-understand areas
- [ ] I have made corresponding changes to the documentation
- [x] My changes generate no new warnings
- [ ] I have added tests that prove my fix is effective or that my
feature works
- [x] New and existing unit tests pass locally with my changes
- [ ] PR is being merged under a feature flag


#### QA activity:
- [ ] [Speedbreak
features](https://github.com/appsmithorg/TestSmith/wiki/Guidelines-for-test-plans#speedbreakers-)
have been covered
- [ ] Test plan covers all impacted features and [areas of
interest](https://github.com/appsmithorg/TestSmith/wiki/Guidelines-for-test-plans#areas-of-interest-)
- [ ] Test plan has been peer reviewed by project stakeholders and other
QA members
- [ ] Manually tested functionality on DP
- [ ] We had an implementation alignment call with stakeholders post QA
Round 2
- [ ] Cypress test cases have been added and approved by SDET/manual QA
- [ ] Added `Test Plan Approved` label after Cypress tests were reviewed
- [ ] Added `Test Plan Approved` label after JUnit tests were reviewed

---------

Co-authored-by: Aishwarya UR <aishwarya@appsmith.com>
2023-08-29 14:21:29 +05:30
Ankita Kinger
ce9c32cb92
chore: Improve code splitting of FE components (#26659)
## Description

Improve code splitting of FE components to avoid minimal changes needed
on EE when CE is modified.

#### PR fixes following issue(s)
Fixes [#24184](https://github.com/appsmithorg/appsmith/issues/24184)

#### Type of change
- Chore (housekeeping or task changes that don't impact user perception)

## Testing

#### How Has This Been Tested?
- [x] Manual
- [ ] JUnit
- [x] Jest
- [x] Cypress

## Checklist:
#### Dev activity
- [x] My code follows the style guidelines of this project
- [x] I have performed a self-review of my own code
- [x] I have commented my code, particularly in hard-to-understand areas
- [ ] I have made corresponding changes to the documentation
- [x] My changes generate no new warnings
- [ ] I have added tests that prove my fix is effective or that my
feature works
- [x] New and existing unit tests pass locally with my changes
- [ ] PR is being merged under a feature flag


#### QA activity:
- [ ] [Speedbreak
features](https://github.com/appsmithorg/TestSmith/wiki/Guidelines-for-test-plans#speedbreakers-)
have been covered
- [ ] Test plan covers all impacted features and [areas of
interest](https://github.com/appsmithorg/TestSmith/wiki/Guidelines-for-test-plans#areas-of-interest-)
- [ ] Test plan has been peer reviewed by project stakeholders and other
QA members
- [ ] Manually tested functionality on DP
- [ ] We had an implementation alignment call with stakeholders post QA
Round 2
- [ ] Cypress test cases have been added and approved by SDET/manual QA
- [ ] Added `Test Plan Approved` label after Cypress tests were reviewed
- [ ] Added `Test Plan Approved` label after JUnit tests were reviewed
2023-08-28 21:07:32 +05:30