> Pull Request Template
>
> Use this template to quickly create a well written pull request.
Delete all quotes before creating the pull request.
>
## Description
Updating the UI for the start from use case flow for new users + adding
building blocks to the list of templates offered to new users in this
flow.
>
> Please include a summary of the changes and which issue has been
fixed. Please also include relevant motivation
> and context. List any dependencies that are required for this change
>
> Links to Notion, Figma or any other documents that might be relevant
to the PR
>
https://www.figma.com/file/kbU9xPv44neCfv1FFo9Ndu/User-Activation?node-id=4293:41450&mode=dev
>
https://www.notion.so/appsmith/Activation-experiment-2-Start-from-a-template-Offer-building-blocks-in-addition-to-templates-8986dfc3629041559c81b1650b3a5fe5?pvs=4
#### PR fixes following issue(s)
Fixes#28605
> if no issue exists, please create an issue and ask the maintainers
about this first
>
>
#### Media
> A video or a GIF is preferred. when using Loom, don’t embed because it
looks like it’s a GIF. instead, just link to the video
>
>
#### Type of change
> Please delete options that are not relevant.
- Bug fix (non-breaking change which fixes an issue)
- New feature (non-breaking change which adds functionality)
- Breaking change (fix or feature that would cause existing
functionality to not work as expected)
- Chore (housekeeping or task changes that don't impact user perception)
- This change requires a documentation update
>
>
>
## Testing
>
#### How Has This Been Tested?
> Please describe the tests that you ran to verify your changes. Also
list any relevant details for your test configuration.
> Delete anything that is not relevant
- [x] Manual
- [ ] JUnit
- [ ] Jest
- [ ] Cypress
>
>
#### Test Plan
> Add Testsmith test cases links that relate to this PR
>
>
#### Issues raised during DP testing
> Link issues raised during DP testing for better visiblity and tracking
(copy link from comments dropped on this PR)
>
>
>
## Checklist:
#### Dev activity
- [x] My code follows the style guidelines of this project
- [x] I have performed a self-review of my own code
- [x] I have commented my code, particularly in hard-to-understand areas
- [ ] I have made corresponding changes to the documentation
- [x] My changes generate no new warnings
- [ ] I have added tests that prove my fix is effective or that my
feature works
- [ ] New and existing unit tests pass locally with my changes
- [x] PR is being merged under a feature flag
#### QA activity:
- [ ] [Speedbreak
features](https://github.com/appsmithorg/TestSmith/wiki/Guidelines-for-test-plans#speedbreakers-)
have been covered
- [ ] Test plan covers all impacted features and [areas of
interest](https://github.com/appsmithorg/TestSmith/wiki/Guidelines-for-test-plans#areas-of-interest-)
- [ ] Test plan has been peer reviewed by project stakeholders and other
QA members
- [ ] Manually tested functionality on DP
- [ ] We had an implementation alignment call with stakeholders post QA
Round 2
- [ ] Cypress test cases have been added and approved by SDET/manual QA
- [ ] Added `Test Plan Approved` label after Cypress tests were reviewed
- [ ] Added `Test Plan Approved` label after JUnit tests were reviewed
## Description
This pull request adds a check to the `PageContextMenu` component to
ensure that developers with the right access can use the export feature.
This check is necessary to prevent unauthorized users from exporting
sensitive data.
#### PR fixes following issue(s)
Fixes # (issue number)
> if no issue exists, please create an issue and ask the maintainers
about this first
>
>
#### Media
> A video or a GIF is preferred. when using Loom, don’t embed because it
looks like it’s a GIF. instead, just link to the video
>
>
#### Type of change
> Please delete options that are not relevant.
- Bug fix (non-breaking change which fixes an issue)
- New feature (non-breaking change which adds functionality)
- Breaking change (fix or feature that would cause existing
functionality to not work as expected)
- Chore (housekeeping or task changes that don't impact user perception)
- This change requires a documentation update
>
>
>
## Testing
>
#### How Has This Been Tested?
> Please describe the tests that you ran to verify your changes. Also
list any relevant details for your test configuration.
> Delete anything that is not relevant
- [ ] Manual
- [ ] JUnit
- [ ] Jest
- [ ] Cypress
>
>
#### Test Plan
> Add Testsmith test cases links that relate to this PR
>
>
#### Issues raised during DP testing
> Link issues raised during DP testing for better visiblity and tracking
(copy link from comments dropped on this PR)
>
>
>
## Checklist:
#### Dev activity
- [ ] My code follows the style guidelines of this project
- [ ] I have performed a self-review of my own code
- [ ] I have commented my code, particularly in hard-to-understand areas
- [ ] I have made corresponding changes to the documentation
- [ ] My changes generate no new warnings
- [ ] I have added tests that prove my fix is effective or that my
feature works
- [ ] New and existing unit tests pass locally with my changes
- [ ] PR is being merged under a feature flag
#### QA activity:
- [ ] [Speedbreak
features](https://github.com/appsmithorg/TestSmith/wiki/Guidelines-for-test-plans#speedbreakers-)
have been covered
- [ ] Test plan covers all impacted features and [areas of
interest](https://github.com/appsmithorg/TestSmith/wiki/Guidelines-for-test-plans#areas-of-interest-)
- [ ] Test plan has been peer reviewed by project stakeholders and other
QA members
- [ ] Manually tested functionality on DP
- [ ] We had an implementation alignment call with stakeholders post QA
Round 2
- [ ] Cypress test cases have been added and approved by SDET/manual QA
- [ ] Added `Test Plan Approved` label after Cypress tests were reviewed
- [ ] Added `Test Plan Approved` label after JUnit tests were reviewed
## Description
This PR fixes the experience of Templates forking in self hosted
instances. And also for to Set up a process to keep the embedded DB up
to date with template db schemas.
We have removed the redirection of mockdb end point used in templates
App when forked in self hosted instance from localhost/internal postgres
db.
This also has a migration which is to make sure that none of existing
apps using the internal postgres does not break due to the removal of
redirection. The migration will make sure that existing self hosted
instances using the posgress db and has a datasource with mockdb end
point will be replaces with localhost.
#### PR fixes following issue(s)
Fixes https://github.com/appsmithorg/appsmith/issues/28924
#### Type of change
- Bug fix (non-breaking change which fixes an issue)
## Testing
#### How Has This Been Tested?
- [ ] Manual
#### Test Plan
> Add Testsmith test cases links that relate to this PR
>
>
#### Issues raised during DP testing
> Link issues raised during DP testing for better visiblity and tracking
(copy link from comments dropped on this PR)
>
>
>
## Checklist:
#### Dev activity
- [ ] My code follows the style guidelines of this project
- [ ] I have performed a self-review of my own code
- [ ] I have commented my code, particularly in hard-to-understand areas
- [ ] I have made corresponding changes to the documentation
- [ ] My changes generate no new warnings
- [ ] I have added tests that prove my fix is effective or that my
feature works
- [ ] New and existing unit tests pass locally with my changes
- [ ] PR is being merged under a feature flag
#### QA activity:
- [ ] [Speedbreak
features](https://github.com/appsmithorg/TestSmith/wiki/Guidelines-for-test-plans#speedbreakers-)
have been covered
- [ ] Test plan covers all impacted features and [areas of
interest](https://github.com/appsmithorg/TestSmith/wiki/Guidelines-for-test-plans#areas-of-interest-)
- [ ] Test plan has been peer reviewed by project stakeholders and other
QA members
- [ ] Manually tested functionality on DP
- [ ] We had an implementation alignment call with stakeholders post QA
Round 2
- [ ] Cypress test cases have been added and approved by SDET/manual QA
- [ ] Added `Test Plan Approved` label after Cypress tests were reviewed
- [ ] Added `Test Plan Approved` label after JUnit tests were reviewed
---------
Co-authored-by: Shrikant Sharat Kandula <shrikant@appsmith.com>
## Description
> Add workflow to the CreatorContextType enum
### PR fixes following issue(s)
Fixes # (issue number)
> if no issue exists, please create an issue and ask the maintainers
about this first
>
>
#### Media
> A video or a GIF is preferred. when using Loom, don’t embed because it
looks like it’s a GIF. instead, just link to the video
>
>
#### Type of change
- Chore (housekeeping or task changes that don't impact user perception)
## Testing
>
#### How Has This Been Tested?
> Since we are only adding an enum, no testing required.
#### Test Plan
> Add Testsmith test cases links that relate to this PR
>
>
#### Issues raised during DP testing
> Link issues raised during DP testing for better visiblity and tracking
(copy link from comments dropped on this PR)
>
>
>
## Checklist:
#### Dev activity
- [ ] My code follows the style guidelines of this project
- [ ] I have performed a self-review of my own code
- [ ] I have commented my code, particularly in hard-to-understand areas
- [ ] I have made corresponding changes to the documentation
- [ ] My changes generate no new warnings
- [ ] I have added tests that prove my fix is effective or that my
feature works
- [ ] New and existing unit tests pass locally with my changes
- [ ] PR is being merged under a feature flag
#### QA activity:
- [ ] [Speedbreak
features](https://github.com/appsmithorg/TestSmith/wiki/Guidelines-for-test-plans#speedbreakers-)
have been covered
- [ ] Test plan covers all impacted features and [areas of
interest](https://github.com/appsmithorg/TestSmith/wiki/Guidelines-for-test-plans#areas-of-interest-)
- [ ] Test plan has been peer reviewed by project stakeholders and other
QA members
- [ ] Manually tested functionality on DP
- [ ] We had an implementation alignment call with stakeholders post QA
Round 2
- [ ] Cypress test cases have been added and approved by SDET/manual QA
- [ ] Added `Test Plan Approved` label after Cypress tests were reviewed
- [ ] Added `Test Plan Approved` label after JUnit tests were reviewed
Co-authored-by: Nilesh Sarupriya <20905988+nsarupr@users.noreply.github.com>
## Description
1. Added frontend and backend custom OTLP telemetry to track execute
flow
2. Updated end vars in client side code to match with server sdk
intialisation code.
#### PR fixes following issue(s)
Fixes#28800 and #28805
#### Type of change
- Chore (housekeeping or task changes that don't impact user perception)
#### How Has This Been Tested?
- [x] Manual
- [ ] JUnit
- [ ] Jest
- [ ] Cypress
>
>
#### Test Plan
> Add Testsmith test cases links that relate to this PR
>
>
#### Issues raised during DP testing
> Link issues raised during DP testing for better visiblity and tracking
(copy link from comments dropped on this PR)
>
>
>
## Checklist:
#### Dev activity
- [x] My code follows the style guidelines of this project
- [x] I have performed a self-review of my own code
- [x] I have commented my code, particularly in hard-to-understand areas
- [ ] I have made corresponding changes to the documentation
- [x] My changes generate no new warnings
- [ ] I have added tests that prove my fix is effective or that my
feature works
- [ ] New and existing unit tests pass locally with my changes
- [ ] PR is being merged under a feature flag
#### QA activity:
- [ ] [Speedbreak
features](https://github.com/appsmithorg/TestSmith/wiki/Guidelines-for-test-plans#speedbreakers-)
have been covered
- [ ] Test plan covers all impacted features and [areas of
interest](https://github.com/appsmithorg/TestSmith/wiki/Guidelines-for-test-plans#areas-of-interest-)
- [ ] Test plan has been peer reviewed by project stakeholders and other
QA members
- [ ] Manually tested functionality on DP
- [ ] We had an implementation alignment call with stakeholders post QA
Round 2
- [ ] Cypress test cases have been added and approved by SDET/manual QA
- [ ] Added `Test Plan Approved` label after Cypress tests were reviewed
- [ ] Added `Test Plan Approved` label after JUnit tests were reviewed
## Description
Refactor PR for action response view and action execution saga
#### PR fixes following issue(s)
Refactor PR for https://github.com/appsmithorg/appsmith-ee/pull/2936
#### Media
> A video or a GIF is preferred. when using Loom, don’t embed because it
looks like it’s a GIF. instead, just link to the video
>
>
#### Type of change
- Chore (housekeeping or task changes that don't impact user perception)
## Testing
>
#### How Has This Been Tested?
> Please describe the tests that you ran to verify your changes. Also
list any relevant details for your test configuration.
> Delete anything that is not relevant
- [ ] Manual
- [ ] JUnit
- [ ] Jest
- [ ] Cypress
>
>
#### Test Plan
> Add Testsmith test cases links that relate to this PR
>
>
#### Issues raised during DP testing
> Link issues raised during DP testing for better visiblity and tracking
(copy link from comments dropped on this PR)
>
>
>
## Checklist:
#### Dev activity
- [ ] My code follows the style guidelines of this project
- [ ] I have performed a self-review of my own code
- [ ] I have commented my code, particularly in hard-to-understand areas
- [ ] I have made corresponding changes to the documentation
- [ ] My changes generate no new warnings
- [ ] I have added tests that prove my fix is effective or that my
feature works
- [ ] New and existing unit tests pass locally with my changes
- [ ] PR is being merged under a feature flag
#### QA activity:
- [ ] [Speedbreak
features](https://github.com/appsmithorg/TestSmith/wiki/Guidelines-for-test-plans#speedbreakers-)
have been covered
- [ ] Test plan covers all impacted features and [areas of
interest](https://github.com/appsmithorg/TestSmith/wiki/Guidelines-for-test-plans#areas-of-interest-)
- [ ] Test plan has been peer reviewed by project stakeholders and other
QA members
- [ ] Manually tested functionality on DP
- [ ] We had an implementation alignment call with stakeholders post QA
Round 2
- [ ] Cypress test cases have been added and approved by SDET/manual QA
- [ ] Added `Test Plan Approved` label after Cypress tests were reviewed
- [ ] Added `Test Plan Approved` label after JUnit tests were reviewed
---------
Co-authored-by: Rishabh-Rathod <rishabh.rathod@appsmith.com>
## Checklist:
#### Dev activity
- [X] My code follows the style guidelines of this project
- [X] I have performed a self-review of my own code
- [X] I have commented my code, particularly in hard-to-understand areas
- [X] I have made corresponding changes to the documentation
- [X] My changes generate no new warnings
- [ ] I have added tests that prove my fix is effective or that my
feature works
- [X] New and existing unit tests pass locally with my changes
- [ ] PR is being merged under a feature flag
#### QA activity:
- [ ] [Speedbreak
features](https://github.com/appsmithorg/TestSmith/wiki/Guidelines-for-test-plans#speedbreakers-)
have been covered
- [ ] Test plan covers all impacted features and [areas of
interest](https://github.com/appsmithorg/TestSmith/wiki/Guidelines-for-test-plans#areas-of-interest-)
- [ ] Test plan has been peer reviewed by project stakeholders and other
QA members
- [ ] Manually tested functionality on DP
- [ ] We had an implementation alignment call with stakeholders post QA
Round 2
- [ ] Cypress test cases have been added and approved by SDET/manual QA
- [ ] Added `Test Plan Approved` label after Cypress tests were reviewed
- [ ] Added `Test Plan Approved` label after JUnit tests were reviewed
## Description
This PR adds junit test case to ensure that whenever there is
appsmithPluginException on server, we never expose the plugin status
code directly, instead we use generic 500 internal server error. The
actual plugin status code is visible inside `response.status`.
#### PR fixes following issue(s)
Fixes#29037
#### Media
> A video or a GIF is preferred. when using Loom, don’t embed because it
looks like it’s a GIF. instead, just link to the video
>
>
#### Type of change
- Chore (housekeeping or task changes that don't impact user perception)
>
>
>
## Testing
>
#### How Has This Been Tested?
> Please describe the tests that you ran to verify your changes. Also
list any relevant details for your test configuration.
> Delete anything that is not relevant
- [ ] Manual
- [x] JUnit
- [ ] Jest
- [ ] Cypress
>
>
#### Test Plan
> Add Testsmith test cases links that relate to this PR
>
>
#### Issues raised during DP testing
> Link issues raised during DP testing for better visiblity and tracking
(copy link from comments dropped on this PR)
>
>
>
## Checklist:
#### Dev activity
- [x] My code follows the style guidelines of this project
- [x] I have performed a self-review of my own code
- [x] I have commented my code, particularly in hard-to-understand areas
- [ ] I have made corresponding changes to the documentation
- [x] My changes generate no new warnings
- [x] I have added tests that prove my fix is effective or that my
feature works
- [ ] New and existing unit tests pass locally with my changes
- [ ] PR is being merged under a feature flag
#### QA activity:
- [ ] [Speedbreak
features](https://github.com/appsmithorg/TestSmith/wiki/Guidelines-for-test-plans#speedbreakers-)
have been covered
- [ ] Test plan covers all impacted features and [areas of
interest](https://github.com/appsmithorg/TestSmith/wiki/Guidelines-for-test-plans#areas-of-interest-)
- [ ] Test plan has been peer reviewed by project stakeholders and other
QA members
- [ ] Manually tested functionality on DP
- [ ] We had an implementation alignment call with stakeholders post QA
Round 2
- [ ] Cypress test cases have been added and approved by SDET/manual QA
- [ ] Added `Test Plan Approved` label after Cypress tests were reviewed
- [ ] Added `Test Plan Approved` label after JUnit tests were reviewed
---------
Co-authored-by: “sneha122” <“sneha@appsmith.com”>
## Description
#### PR fixes following issue(s)
Fixes https://github.com/appsmithorg/appsmith/issues/28833
Fixes https://github.com/appsmithorg/appsmith/issues/28834
Fixes https://github.com/appsmithorg/appsmith/issues/28835
Fixes https://github.com/appsmithorg/appsmith/issues/28811
#### Media
> A video or a GIF is preferred. when using Loom, don’t embed because it
looks like it’s a GIF. instead, just link to the video
>
>
#### Type of change
> Please delete options that are not relevant.
- Bug fix (non-breaking change which fixes an issue)
- New feature (non-breaking change which adds functionality)
- Breaking change (fix or feature that would cause existing
functionality to not work as expected)
- Chore (housekeeping or task changes that don't impact user perception)
- This change requires a documentation update
>
>
>
## Testing
>
#### How Has This Been Tested?
> Please describe the tests that you ran to verify your changes. Also
list any relevant details for your test configuration.
> Delete anything that is not relevant
- [ ] Manual
- [ ] JUnit
- [ ] Jest
- [ ] Cypress
>
>
#### Test Plan
> Add Testsmith test cases links that relate to this PR
>
>
#### Issues raised during DP testing
> Link issues raised during DP testing for better visiblity and tracking
(copy link from comments dropped on this PR)
>
>
>
## Checklist:
#### Dev activity
- [ ] My code follows the style guidelines of this project
- [ ] I have performed a self-review of my own code
- [ ] I have commented my code, particularly in hard-to-understand areas
- [ ] I have made corresponding changes to the documentation
- [ ] My changes generate no new warnings
- [ ] I have added tests that prove my fix is effective or that my
feature works
- [ ] New and existing unit tests pass locally with my changes
- [ ] PR is being merged under a feature flag
#### QA activity:
- [ ] [Speedbreak
features](https://github.com/appsmithorg/TestSmith/wiki/Guidelines-for-test-plans#speedbreakers-)
have been covered
- [ ] Test plan covers all impacted features and [areas of
interest](https://github.com/appsmithorg/TestSmith/wiki/Guidelines-for-test-plans#areas-of-interest-)
- [ ] Test plan has been peer reviewed by project stakeholders and other
QA members
- [ ] Manually tested functionality on DP
- [ ] We had an implementation alignment call with stakeholders post QA
Round 2
- [ ] Cypress test cases have been added and approved by SDET/manual QA
- [ ] Added `Test Plan Approved` label after Cypress tests were reviewed
- [ ] Added `Test Plan Approved` label after JUnit tests were reviewed
---------
Co-authored-by: Hetu Nandu <hetu@appsmith.com>
Co-authored-by: Hetu Nandu <hetunandu@gmail.com>
## Description
PR for fixing the logs where we were referencing the feature flags are
getting fetched from CS, which is not the case for airgapped version.
## Description
Splitting explorer hooks to support module instances
#### PR fixes following issue(s)
Fixes [#26517](https://github.com/appsmithorg/appsmith/issues/26517)
#### Type of change
- Chore (housekeeping or task changes that don't impact user perception)
## Testing
#### How Has This Been Tested?
- [x] Manual
- [ ] JUnit
- [x] Jest
- [x] Cypress
## Checklist:
#### Dev activity
- [x] My code follows the style guidelines of this project
- [x] I have performed a self-review of my own code
- [x] I have commented my code, particularly in hard-to-understand areas
- [ ] I have made corresponding changes to the documentation
- [x] My changes generate no new warnings
- [ ] I have added tests that prove my fix is effective or that my
feature works
- [x] New and existing unit tests pass locally with my changes
- [ ] PR is being merged under a feature flag
#### QA activity:
- [ ] [Speedbreak
features](https://github.com/appsmithorg/TestSmith/wiki/Guidelines-for-test-plans#speedbreakers-)
have been covered
- [ ] Test plan covers all impacted features and [areas of
interest](https://github.com/appsmithorg/TestSmith/wiki/Guidelines-for-test-plans#areas-of-interest-)
- [ ] Test plan has been peer reviewed by project stakeholders and other
QA members
- [ ] Manually tested functionality on DP
- [ ] We had an implementation alignment call with stakeholders post QA
Round 2
- [ ] Cypress test cases have been added and approved by SDET/manual QA
- [ ] Added `Test Plan Approved` label after Cypress tests were reviewed
- [ ] Added `Test Plan Approved` label after JUnit tests were reviewed
## Description
> Added multi part form data application/json support
### PR fixes following issue(s)
Fixes#28419
#### Type of change
- Feature Improvement
#### How Has This Been Tested?
> Please describe the tests that you ran to verify your changes. Also
list any relevant details for your test configuration.
> Delete anything that is not relevant
- [x] Manual
- [x] JUnit
## Description
Change for set evalContext for module instance
#### PR fixes following issue(s)
Fixes #
#### Type of change
- Chore (housekeeping or task changes that don't impact user perception)
## Testing
>
#### How Has This Been Tested?
> Please describe the tests that you ran to verify your changes. Also
list any relevant details for your test configuration.
> Delete anything that is not relevant
- [ ] Manual
- [ ] JUnit
- [ ] Jest
- [ ] Cypress
>
>
#### Test Plan
> Add Testsmith test cases links that relate to this PR
>
>
#### Issues raised during DP testing
> Link issues raised during DP testing for better visiblity and tracking
(copy link from comments dropped on this PR)
>
>
>
## Checklist:
#### Dev activity
- [ ] My code follows the style guidelines of this project
- [ ] I have performed a self-review of my own code
- [ ] I have commented my code, particularly in hard-to-understand areas
- [ ] I have made corresponding changes to the documentation
- [ ] My changes generate no new warnings
- [ ] I have added tests that prove my fix is effective or that my
feature works
- [ ] New and existing unit tests pass locally with my changes
- [ ] PR is being merged under a feature flag
#### QA activity:
- [ ] [Speedbreak
features](https://github.com/appsmithorg/TestSmith/wiki/Guidelines-for-test-plans#speedbreakers-)
have been covered
- [ ] Test plan covers all impacted features and [areas of
interest](https://github.com/appsmithorg/TestSmith/wiki/Guidelines-for-test-plans#areas-of-interest-)
- [ ] Test plan has been peer reviewed by project stakeholders and other
QA members
- [ ] Manually tested functionality on DP
- [ ] We had an implementation alignment call with stakeholders post QA
Round 2
- [ ] Cypress test cases have been added and approved by SDET/manual QA
- [ ] Added `Test Plan Approved` label after Cypress tests were reviewed
- [ ] Added `Test Plan Approved` label after JUnit tests were reviewed
## Description
Module instance evaluation required split to be extended on EE
#### PR fixes following issue(s)
Fixes # (issue number)
> if no issue exists, please create an issue and ask the maintainers
about this first
>
>
#### Media
> A video or a GIF is preferred. when using Loom, don’t embed because it
looks like it’s a GIF. instead, just link to the video
>
>
#### Type of change
> Please delete options that are not relevant.
- Bug fix (non-breaking change which fixes an issue)
- New feature (non-breaking change which adds functionality)
- Breaking change (fix or feature that would cause existing
functionality to not work as expected)
- Chore (housekeeping or task changes that don't impact user perception)
- This change requires a documentation update
>
>
>
## Testing
>
#### How Has This Been Tested?
> Please describe the tests that you ran to verify your changes. Also
list any relevant details for your test configuration.
> Delete anything that is not relevant
- [ ] Manual
- [ ] JUnit
- [ ] Jest
- [ ] Cypress
>
>
#### Test Plan
> Add Testsmith test cases links that relate to this PR
>
>
#### Issues raised during DP testing
> Link issues raised during DP testing for better visiblity and tracking
(copy link from comments dropped on this PR)
>
>
>
## Checklist:
#### Dev activity
- [ ] My code follows the style guidelines of this project
- [ ] I have performed a self-review of my own code
- [ ] I have commented my code, particularly in hard-to-understand areas
- [ ] I have made corresponding changes to the documentation
- [ ] My changes generate no new warnings
- [ ] I have added tests that prove my fix is effective or that my
feature works
- [ ] New and existing unit tests pass locally with my changes
- [ ] PR is being merged under a feature flag
#### QA activity:
- [ ] [Speedbreak
features](https://github.com/appsmithorg/TestSmith/wiki/Guidelines-for-test-plans#speedbreakers-)
have been covered
- [ ] Test plan covers all impacted features and [areas of
interest](https://github.com/appsmithorg/TestSmith/wiki/Guidelines-for-test-plans#areas-of-interest-)
- [ ] Test plan has been peer reviewed by project stakeholders and other
QA members
- [ ] Manually tested functionality on DP
- [ ] We had an implementation alignment call with stakeholders post QA
Round 2
- [ ] Cypress test cases have been added and approved by SDET/manual QA
- [ ] Added `Test Plan Approved` label after Cypress tests were reviewed
- [ ] Added `Test Plan Approved` label after JUnit tests were reviewed
## Description
This PR prevents logging of error analytics on first page load, and page
navigation
#### PR fixes following issue(s)
Fixes#29018
#### Media
> A video or a GIF is preferred. when using Loom, don’t embed because it
looks like it’s a GIF. instead, just link to the video
>
>
#### Type of change
> Please delete options that are not relevant.
- Bug fix (non-breaking change which fixes an issue)
- New feature (non-breaking change which adds functionality)
- Breaking change (fix or feature that would cause existing
functionality to not work as expected)
- Chore (housekeeping or task changes that don't impact user perception)
- This change requires a documentation update
>
>
>
## Testing
>
#### How Has This Been Tested?
> Please describe the tests that you ran to verify your changes. Also
list any relevant details for your test configuration.
> Delete anything that is not relevant
- [ ] Manual
- [ ] JUnit
- [ ] Jest
- [ ] Cypress
>
>
#### Test Plan
> Add Testsmith test cases links that relate to this PR
>
>
#### Issues raised during DP testing
> Link issues raised during DP testing for better visiblity and tracking
(copy link from comments dropped on this PR)
>
>
>
## Checklist:
#### Dev activity
- [ ] My code follows the style guidelines of this project
- [ ] I have performed a self-review of my own code
- [ ] I have commented my code, particularly in hard-to-understand areas
- [ ] I have made corresponding changes to the documentation
- [ ] My changes generate no new warnings
- [ ] I have added tests that prove my fix is effective or that my
feature works
- [ ] New and existing unit tests pass locally with my changes
- [ ] PR is being merged under a feature flag
#### QA activity:
- [ ] [Speedbreak
features](https://github.com/appsmithorg/TestSmith/wiki/Guidelines-for-test-plans#speedbreakers-)
have been covered
- [ ] Test plan covers all impacted features and [areas of
interest](https://github.com/appsmithorg/TestSmith/wiki/Guidelines-for-test-plans#areas-of-interest-)
- [ ] Test plan has been peer reviewed by project stakeholders and other
QA members
- [ ] Manually tested functionality on DP
- [ ] We had an implementation alignment call with stakeholders post QA
Round 2
- [ ] Cypress test cases have been added and approved by SDET/manual QA
- [ ] Added `Test Plan Approved` label after Cypress tests were reviewed
- [ ] Added `Test Plan Approved` label after JUnit tests were reviewed
## Description
Code changes to preserve execution data when a Query/JS Object is
renamed.
>
#### PR fixes following issue(s)
Fixes#28985
>
>
#### Media
> A video or a GIF is preferred. when using Loom, don’t embed because it
looks like it’s a GIF. instead, just link to the video
>
>
#### Type of change
- Bug fix (non-breaking change which fixes an issue)
>
>
>
## Testing
>
#### How Has This Been Tested?
- [x] Manual
- [x] Cypress
>
>
#### Test Plan
> Add Testsmith test cases links that relate to this PR
>
>
#### Issues raised during DP testing
> Link issues raised during DP testing for better visiblity and tracking
(copy link from comments dropped on this PR)
>
>
>
## Checklist:
#### Dev activity
- [x] My code follows the style guidelines of this project
- [x] I have performed a self-review of my own code
- [ ] I have commented my code, particularly in hard-to-understand areas
- [ ] I have made corresponding changes to the documentation
- [x] My changes generate no new warnings
- [x] I have added tests that prove my fix is effective or that my
feature works
- [x] New and existing unit tests pass locally with my changes
- [ ] PR is being merged under a feature flag
#### QA activity:
- [ ] [Speedbreak
features](https://github.com/appsmithorg/TestSmith/wiki/Guidelines-for-test-plans#speedbreakers-)
have been covered
- [ ] Test plan covers all impacted features and [areas of
interest](https://github.com/appsmithorg/TestSmith/wiki/Guidelines-for-test-plans#areas-of-interest-)
- [ ] Test plan has been peer reviewed by project stakeholders and other
QA members
- [ ] Manually tested functionality on DP
- [ ] We had an implementation alignment call with stakeholders post QA
Round 2
- [ ] Cypress test cases have been added and approved by SDET/manual QA
- [ ] Added `Test Plan Approved` label after Cypress tests were reviewed
- [ ] Added `Test Plan Approved` label after JUnit tests were reviewed
## Description
Implement WDS components and tokenst at header of table widget
#### PR fixes following issue(s)
Fixes#28391
#### Media
https://github.com/appsmithorg/appsmith/assets/11555074/456babee-ff8f-4771-8867-f44ae5bbe236
#### Type of change
- New feature (non-breaking change which adds functionality)
## Testing
>
#### How Has This Been Tested?
> Please describe the tests that you ran to verify your changes. Also
list any relevant details for your test configuration.
> Delete anything that is not relevant
- [x] Manual
- [ ] JUnit
- [ ] Jest
- [ ] Cypress
## Checklist:
#### Dev activity
- [x] My code follows the style guidelines of this project
- [x] I have performed a self-review of my own code
- [x] I have commented my code, particularly in hard-to-understand areas
- [x] I have made corresponding changes to the documentation
- [x] My changes generate no new warnings
- [ ] I have added tests that prove my fix is effective or that my
feature works
- [x] New and existing unit tests pass locally with my changes
- [ ] PR is being merged under a feature flag
## Description
This PR fixes the order of plugins in most popular datasource section in
create new datasource page, The correct order should be Gsheets, REST,
Postgres, MySQL, MongoDB
#### PR fixes following issue(s)
Fixes#28931
#### Media
> A video or a GIF is preferred. when using Loom, don’t embed because it
looks like it’s a GIF. instead, just link to the video
>
>
#### Type of change
> Please delete options that are not relevant.
- Bug fix (non-breaking change which fixes an issue)
>
>
>
## Testing
>
#### How Has This Been Tested?
> Please describe the tests that you ran to verify your changes. Also
list any relevant details for your test configuration.
> Delete anything that is not relevant
- [x] Manual
- [ ] JUnit
- [ ] Jest
- [ ] Cypress
>
>
#### Test Plan
> Add Testsmith test cases links that relate to this PR
>
>
#### Issues raised during DP testing
> Link issues raised during DP testing for better visiblity and tracking
(copy link from comments dropped on this PR)
>
>
>
## Checklist:
#### Dev activity
- [x] My code follows the style guidelines of this project
- [x] I have performed a self-review of my own code
- [x] I have commented my code, particularly in hard-to-understand areas
- [ ] I have made corresponding changes to the documentation
- [x] My changes generate no new warnings
- [ ] I have added tests that prove my fix is effective or that my
feature works
- [ ] New and existing unit tests pass locally with my changes
- [x] PR is being merged under a feature flag
#### QA activity:
- [ ] [Speedbreak
features](https://github.com/appsmithorg/TestSmith/wiki/Guidelines-for-test-plans#speedbreakers-)
have been covered
- [ ] Test plan covers all impacted features and [areas of
interest](https://github.com/appsmithorg/TestSmith/wiki/Guidelines-for-test-plans#areas-of-interest-)
- [ ] Test plan has been peer reviewed by project stakeholders and other
QA members
- [ ] Manually tested functionality on DP
- [ ] We had an implementation alignment call with stakeholders post QA
Round 2
- [ ] Cypress test cases have been added and approved by SDET/manual QA
- [ ] Added `Test Plan Approved` label after Cypress tests were reviewed
- [ ] Added `Test Plan Approved` label after JUnit tests were reviewed
---------
Co-authored-by: “sneha122” <“sneha@appsmith.com”>
## Description
Fix partial import issue in git connected app. When the update call was
triggered due to the EncryptionHandler not being triggered there was Hex
coded string issue for SSH keys. Replaced the update call parameter with
the actual updates and not whole application object.
#### PR fixes following issue(s)
Fixes https://github.com/appsmithorg/appsmith/issues/29000
#### Type of change
- Bug fix (non-breaking change which fixes an issue)
## Testing
#### How Has This Been Tested?
- [ ] Manual
#### Issues raised during DP testing
> Link issues raised during DP testing for better visiblity and tracking
(copy link from comments dropped on this PR)
>
>
>
## Checklist:
#### Dev activity
- [ ] My code follows the style guidelines of this project
- [ ] I have performed a self-review of my own code
- [ ] I have commented my code, particularly in hard-to-understand areas
- [ ] I have made corresponding changes to the documentation
- [ ] My changes generate no new warnings
- [ ] I have added tests that prove my fix is effective or that my
feature works
- [ ] New and existing unit tests pass locally with my changes
- [ ] PR is being merged under a feature flag
#### QA activity:
- [ ] [Speedbreak
features](https://github.com/appsmithorg/TestSmith/wiki/Guidelines-for-test-plans#speedbreakers-)
have been covered
- [ ] Test plan covers all impacted features and [areas of
interest](https://github.com/appsmithorg/TestSmith/wiki/Guidelines-for-test-plans#areas-of-interest-)
- [ ] Test plan has been peer reviewed by project stakeholders and other
QA members
- [ ] Manually tested functionality on DP
- [ ] We had an implementation alignment call with stakeholders post QA
Round 2
- [ ] Cypress test cases have been added and approved by SDET/manual QA
- [ ] Added `Test Plan Approved` label after Cypress tests were reviewed
- [ ] Added `Test Plan Approved` label after JUnit tests were reviewed
## Description
- Skip flaky tests on demand
#### Type of change
- Dime defenders changes to accommodate the flaky spec skip on demand
- Workflow changes to control the skip flaky functionality
## Description
Fix partial export for git connected apps.
#### PR fixes following issue(s)
Fixes https://github.com/appsmithorg/appsmith/issues/28997
#### Type of change
- Bug fix (non-breaking change which fixes an issue)
## Testing
>
#### How Has This Been Tested?
> Please describe the tests that you ran to verify your changes. Also
list any relevant details for your test configuration.
> Delete anything that is not relevant
- [ ] Manual
#### Test Plan
> Add Testsmith test cases links that relate to this PR
>
>
#### Issues raised during DP testing
> Link issues raised during DP testing for better visiblity and tracking
(copy link from comments dropped on this PR)
>
>
>
## Checklist:
#### Dev activity
- [ ] My code follows the style guidelines of this project
- [ ] I have performed a self-review of my own code
- [ ] I have commented my code, particularly in hard-to-understand areas
- [ ] I have made corresponding changes to the documentation
- [ ] My changes generate no new warnings
- [ ] I have added tests that prove my fix is effective or that my
feature works
- [ ] New and existing unit tests pass locally with my changes
- [ ] PR is being merged under a feature flag
#### QA activity:
- [ ] [Speedbreak
features](https://github.com/appsmithorg/TestSmith/wiki/Guidelines-for-test-plans#speedbreakers-)
have been covered
- [ ] Test plan covers all impacted features and [areas of
interest](https://github.com/appsmithorg/TestSmith/wiki/Guidelines-for-test-plans#areas-of-interest-)
- [ ] Test plan has been peer reviewed by project stakeholders and other
QA members
- [ ] Manually tested functionality on DP
- [ ] We had an implementation alignment call with stakeholders post QA
Round 2
- [ ] Cypress test cases have been added and approved by SDET/manual QA
- [ ] Added `Test Plan Approved` label after Cypress tests were reviewed
- [ ] Added `Test Plan Approved` label after JUnit tests were reviewed
## Description
Peekoverlay changes for moduleInput
- Introduce `getEntityPeekData` that will be extended in EE codebase for
moduleInput entity
#### PR fixes following issue(s)
Fixes # (issue number)
#### Type of change
- Chore (housekeeping or task changes that don't impact user perception)
## Testing
>
#### How Has This Been Tested?
> Please describe the tests that you ran to verify your changes. Also
list any relevant details for your test configuration.
> Delete anything that is not relevant
- [ ] Manual
- [ ] JUnit
- [ ] Jest
- [ ] Cypress
>
>
#### Test Plan
> Add Testsmith test cases links that relate to this PR
>
>
#### Issues raised during DP testing
> Link issues raised during DP testing for better visiblity and tracking
(copy link from comments dropped on this PR)
>
>
>
## Checklist:
#### Dev activity
- [ ] My code follows the style guidelines of this project
- [ ] I have performed a self-review of my own code
- [ ] I have commented my code, particularly in hard-to-understand areas
- [ ] I have made corresponding changes to the documentation
- [ ] My changes generate no new warnings
- [ ] I have added tests that prove my fix is effective or that my
feature works
- [ ] New and existing unit tests pass locally with my changes
- [ ] PR is being merged under a feature flag
#### QA activity:
- [ ] [Speedbreak
features](https://github.com/appsmithorg/TestSmith/wiki/Guidelines-for-test-plans#speedbreakers-)
have been covered
- [ ] Test plan covers all impacted features and [areas of
interest](https://github.com/appsmithorg/TestSmith/wiki/Guidelines-for-test-plans#areas-of-interest-)
- [ ] Test plan has been peer reviewed by project stakeholders and other
QA members
- [ ] Manually tested functionality on DP
- [ ] We had an implementation alignment call with stakeholders post QA
Round 2
- [ ] Cypress test cases have been added and approved by SDET/manual QA
- [ ] Added `Test Plan Approved` label after Cypress tests were reviewed
- [ ] Added `Test Plan Approved` label after JUnit tests were reviewed
## Description
When the templates endpoint on cloud services is not reachable from the
platform, toasts with a generic error message appear. The messaging
needs to be improved to indicate that this owing to the templates (or
any other relevant endpoint) on cloud services.
#### PR fixes following issue(s)
Fixes https://github.com/appsmithorg/appsmith/issues/23196
#### Type of change
- Bug fix (non-breaking change which fixes an issue)
## Testing
#### How Has This Been Tested?
- [ ] Manual
- [ ] JUnit
#### Test Plan
> Add Testsmith test cases links that relate to this PR
>
>
#### Issues raised during DP testing
> Link issues raised during DP testing for better visiblity and tracking
(copy link from comments dropped on this PR)
>
>
>
## Checklist:
#### Dev activity
- [ ] My code follows the style guidelines of this project
- [ ] I have performed a self-review of my own code
- [ ] I have commented my code, particularly in hard-to-understand areas
- [ ] I have made corresponding changes to the documentation
- [ ] My changes generate no new warnings
- [ ] I have added tests that prove my fix is effective or that my
feature works
- [ ] New and existing unit tests pass locally with my changes
- [ ] PR is being merged under a feature flag
#### QA activity:
- [ ] [Speedbreak
features](https://github.com/appsmithorg/TestSmith/wiki/Guidelines-for-test-plans#speedbreakers-)
have been covered
- [ ] Test plan covers all impacted features and [areas of
interest](https://github.com/appsmithorg/TestSmith/wiki/Guidelines-for-test-plans#areas-of-interest-)
- [ ] Test plan has been peer reviewed by project stakeholders and other
QA members
- [ ] Manually tested functionality on DP
- [ ] We had an implementation alignment call with stakeholders post QA
Round 2
- [ ] Cypress test cases have been added and approved by SDET/manual QA
- [ ] Added `Test Plan Approved` label after Cypress tests were reviewed
- [ ] Added `Test Plan Approved` label after JUnit tests were reviewed
## Description
This pull request fixes an issue where the reset click for "JS objects"
was not functioning correctly. The reset click now works as expected.
Fix capitalization of "JS objects" in export modal
#### PR fixes following issue(s)
Fixes # (issue number)
#### Type of change
- Bug fix (non-breaking change which fixes an issue)
## Testing
>
#### How Has This Been Tested?
> Please describe the tests that you ran to verify your changes. Also
list any relevant details for your test configuration.
> Delete anything that is not relevant
- [ ] Manual
- [ ] JUnit
- [ ] Jest
- [ ] Cypress
>
>
#### Test Plan
> Add Testsmith test cases links that relate to this PR
>
>
#### Issues raised during DP testing
> Link issues raised during DP testing for better visiblity and tracking
(copy link from comments dropped on this PR)
>
>
>
## Checklist:
#### Dev activity
- [ ] My code follows the style guidelines of this project
- [ ] I have performed a self-review of my own code
- [ ] I have commented my code, particularly in hard-to-understand areas
- [ ] I have made corresponding changes to the documentation
- [ ] My changes generate no new warnings
- [ ] I have added tests that prove my fix is effective or that my
feature works
- [ ] New and existing unit tests pass locally with my changes
- [ ] PR is being merged under a feature flag
#### QA activity:
- [ ] [Speedbreak
features](https://github.com/appsmithorg/TestSmith/wiki/Guidelines-for-test-plans#speedbreakers-)
have been covered
- [ ] Test plan covers all impacted features and [areas of
interest](https://github.com/appsmithorg/TestSmith/wiki/Guidelines-for-test-plans#areas-of-interest-)
- [ ] Test plan has been peer reviewed by project stakeholders and other
QA members
- [ ] Manually tested functionality on DP
- [ ] We had an implementation alignment call with stakeholders post QA
Round 2
- [ ] Cypress test cases have been added and approved by SDET/manual QA
- [ ] Added `Test Plan Approved` label after Cypress tests were reviewed
- [ ] Added `Test Plan Approved` label after JUnit tests were reviewed
## Description
Adds WDS Switch Group Widget.
#### PR fixes following issue(s)
Fixes#28465
#### Media
<video
src="https://github.com/appsmithorg/appsmith/assets/22471214/93088670-ef1c-4047-a03c-3ff43aa16341"></video>
#### Type of change
- New feature (non-breaking change which adds functionality)
-
## Testing
>
#### How Has This Been Tested?
> Please describe the tests that you ran to verify your changes. Also
list any relevant details for your test configuration.
> Delete anything that is not relevant
- [ ] Manual
- [ ] JUnit
- [ ] Jest
- [ ] Cypress
>
>
#### Test Plan
> Add Testsmith test cases links that relate to this PR
>
>
#### Issues raised during DP testing
> Link issues raised during DP testing for better visiblity and tracking
(copy link from comments dropped on this PR)
>
>
>
## Checklist:
#### Dev activity
- [ ] My code follows the style guidelines of this project
- [ ] I have performed a self-review of my own code
- [ ] I have commented my code, particularly in hard-to-understand areas
- [ ] I have made corresponding changes to the documentation
- [ ] My changes generate no new warnings
- [ ] I have added tests that prove my fix is effective or that my
feature works
- [ ] New and existing unit tests pass locally with my changes
- [ ] PR is being merged under a feature flag
#### QA activity:
- [ ] [Speedbreak
features](https://github.com/appsmithorg/TestSmith/wiki/Guidelines-for-test-plans#speedbreakers-)
have been covered
- [ ] Test plan covers all impacted features and [areas of
interest](https://github.com/appsmithorg/TestSmith/wiki/Guidelines-for-test-plans#areas-of-interest-)
- [ ] Test plan has been peer reviewed by project stakeholders and other
QA members
- [ ] Manually tested functionality on DP
- [ ] We had an implementation alignment call with stakeholders post QA
Round 2
- [ ] Cypress test cases have been added and approved by SDET/manual QA
- [ ] Added `Test Plan Approved` label after Cypress tests were reviewed
- [ ] Added `Test Plan Approved` label after JUnit tests were reviewed
## Description
Added a new step to display the datasources when a user clicks on the
`Start with data` option in the onboarding flow for creating new apps.
#### PR fixes following issue(s)
Fixes#28552Fixes#28807
> if no issue exists, please create an issue and ask the maintainers
about this first
>
>
#### Media
> A video or a GIF is preferred. when using Loom, don’t embed because it
looks like it’s a GIF. instead, just link to the video
>
>
#### Type of change
> Please delete options that are not relevant.
- Bug fix (non-breaking change which fixes an issue)
- New feature (non-breaking change which adds functionality)
- Breaking change (fix or feature that would cause existing
functionality to not work as expected)
- Chore (housekeeping or task changes that don't impact user perception)
- This change requires a documentation update
>
>
>
## Testing
>
#### How Has This Been Tested?
> Please describe the tests that you ran to verify your changes. Also
list any relevant details for your test configuration.
> Delete anything that is not relevant
- [ ] Manual
- [ ] JUnit
- [ ] Jest
- [ ] Cypress
>
>
#### Test Plan
> Add Testsmith test cases links that relate to this PR
>
>
#### Issues raised during DP testing
> Link issues raised during DP testing for better visiblity and tracking
(copy link from comments dropped on this PR)
>
>
>
## Checklist:
#### Dev activity
- [ ] My code follows the style guidelines of this project
- [ ] I have performed a self-review of my own code
- [ ] I have commented my code, particularly in hard-to-understand areas
- [ ] I have made corresponding changes to the documentation
- [ ] My changes generate no new warnings
- [ ] I have added tests that prove my fix is effective or that my
feature works
- [ ] New and existing unit tests pass locally with my changes
- [ ] PR is being merged under a feature flag
#### QA activity:
- [ ] [Speedbreak
features](https://github.com/appsmithorg/TestSmith/wiki/Guidelines-for-test-plans#speedbreakers-)
have been covered
- [ ] Test plan covers all impacted features and [areas of
interest](https://github.com/appsmithorg/TestSmith/wiki/Guidelines-for-test-plans#areas-of-interest-)
- [ ] Test plan has been peer reviewed by project stakeholders and other
QA members
- [ ] Manually tested functionality on DP
- [ ] We had an implementation alignment call with stakeholders post QA
Round 2
- [ ] Cypress test cases have been added and approved by SDET/manual QA
- [ ] Added `Test Plan Approved` label after Cypress tests were reviewed
- [ ] Added `Test Plan Approved` label after JUnit tests were reviewed
---------
Co-authored-by: nilansh <nilansh@appsmith.com>
Co-authored-by: “sneha122” <“sneha@appsmith.com”>
> Pull Request Template
>
> Use this template to quickly create a well written pull request.
Delete all quotes before creating the pull request.
>
## Description
> Add a TL;DR when description is extra long (helps content team)
>
> Please include a summary of the changes and which issue has been
fixed. Please also include relevant motivation
> and context. List any dependencies that are required for this change
>
> Links to Notion, Figma or any other documents that might be relevant
to the PR
>
>
#### PR fixes following issue(s)
Fixes # (issue number)
> if no issue exists, please create an issue and ask the maintainers
about this first
>
>
#### Media
> A video or a GIF is preferred. when using Loom, don’t embed because it
looks like it’s a GIF. instead, just link to the video
>
>
#### Type of change
> Please delete options that are not relevant.
- Bug fix (non-breaking change which fixes an issue)
- New feature (non-breaking change which adds functionality)
- Breaking change (fix or feature that would cause existing
functionality to not work as expected)
- Chore (housekeeping or task changes that don't impact user perception)
- This change requires a documentation update
>
>
>
## Testing
>
#### How Has This Been Tested?
> Please describe the tests that you ran to verify your changes. Also
list any relevant details for your test configuration.
> Delete anything that is not relevant
- [ ] Manual
- [ ] JUnit
- [ ] Jest
- [ ] Cypress
>
>
#### Test Plan
> Add Testsmith test cases links that relate to this PR
>
>
#### Issues raised during DP testing
> Link issues raised during DP testing for better visiblity and tracking
(copy link from comments dropped on this PR)
>
>
>
## Checklist:
#### Dev activity
- [ ] My code follows the style guidelines of this project
- [ ] I have performed a self-review of my own code
- [ ] I have commented my code, particularly in hard-to-understand areas
- [ ] I have made corresponding changes to the documentation
- [ ] My changes generate no new warnings
- [ ] I have added tests that prove my fix is effective or that my
feature works
- [ ] New and existing unit tests pass locally with my changes
- [ ] PR is being merged under a feature flag
#### QA activity:
- [ ] [Speedbreak
features](https://github.com/appsmithorg/TestSmith/wiki/Guidelines-for-test-plans#speedbreakers-)
have been covered
- [ ] Test plan covers all impacted features and [areas of
interest](https://github.com/appsmithorg/TestSmith/wiki/Guidelines-for-test-plans#areas-of-interest-)
- [ ] Test plan has been peer reviewed by project stakeholders and other
QA members
- [ ] Manually tested functionality on DP
- [ ] We had an implementation alignment call with stakeholders post QA
Round 2
- [ ] Cypress test cases have been added and approved by SDET/manual QA
- [ ] Added `Test Plan Approved` label after Cypress tests were reviewed
- [ ] Added `Test Plan Approved` label after JUnit tests were reviewed
## Description
The App sidebar introduces a new Focus Entity in Context Switching. In
this, whenever a user clicks the sidebar navigation item, we will ensure
the last visited state is restored for that state. We do this by storing
and restoring the last url on the App Sidebar state before navigating
away. Internal focus entities (Datasource, Query etc) will then restore
their last states in a cascading fashion.
I took this opportunity to also refactor the URL storing of App Page
Level focus, which also relies of storing and restoring urls. This
reduces the tech debt introduced earlier and makes the functionality
more configurable for future use cases.
#### PR fixes following issue(s)
Fixes#28873
#### Media
https://github.com/appsmithorg/appsmith/assets/12022471/47c38835-37c7-4c8c-bad3-b5830702d74b
#### Type of change
- Chore (housekeeping or task changes that don't impact user perception)
## Testing
#### How Has This Been Tested?
- [ ] Manual
- [ ] Jest (Updated existing tests)
- [ ] Cypress (Made sure all existing tests pass)
#### Test Plan
> Add Testsmith test cases links that relate to this PR
>
>
#### Issues raised during DP testing
> Link issues raised during DP testing for better visiblity and tracking
(copy link from comments dropped on this PR)
>
>
>
## Checklist:
#### Dev activity
- [ ] My code follows the style guidelines of this project
- [ ] I have performed a self-review of my own code
- [ ] I have commented my code, particularly in hard-to-understand areas
- [ ] I have made corresponding changes to the documentation
- [ ] My changes generate no new warnings
- [ ] I have added tests that prove my fix is effective or that my
feature works
- [ ] New and existing unit tests pass locally with my changes
- [ ] PR is being merged under a feature flag
#### QA activity:
- [ ] [Speedbreak
features](https://github.com/appsmithorg/TestSmith/wiki/Guidelines-for-test-plans#speedbreakers-)
have been covered
- [ ] Test plan covers all impacted features and [areas of
interest](https://github.com/appsmithorg/TestSmith/wiki/Guidelines-for-test-plans#areas-of-interest-)
- [ ] Test plan has been peer reviewed by project stakeholders and other
QA members
- [ ] Manually tested functionality on DP
- [ ] We had an implementation alignment call with stakeholders post QA
Round 2
- [ ] Cypress test cases have been added and approved by SDET/manual QA
- [ ] Added `Test Plan Approved` label after Cypress tests were reviewed
- [ ] Added `Test Plan Approved` label after JUnit tests were reviewed