## Description
- Fix cypress local run
#### PR fixes following issue(s)
Fixes # (issue number)
> if no issue exists, please create an issue and ask the maintainers
about this first
>
>
#### Media
> A video or a GIF is preferred. when using Loom, don’t embed because it
looks like it’s a GIF. instead, just link to the video
>
>
#### Type of change
> Please delete options that are not relevant.
- Bug fix (non-breaking change which fixes an issue)
- New feature (non-breaking change which adds functionality)
- Breaking change (fix or feature that would cause existing
functionality to not work as expected)
- Chore (housekeeping or task changes that don't impact user perception)
- This change requires a documentation update
>
>
>
## Testing
>
#### How Has This Been Tested?
> Please describe the tests that you ran to verify your changes. Also
list any relevant details for your test configuration.
> Delete anything that is not relevant
- [ ] Manual
- [ ] JUnit
- [ ] Jest
- [ ] Cypress
>
>
#### Test Plan
> Add Testsmith test cases links that relate to this PR
>
>
#### Issues raised during DP testing
> Link issues raised during DP testing for better visiblity and tracking
(copy link from comments dropped on this PR)
>
>
>
## Checklist:
#### Dev activity
- [ ] My code follows the style guidelines of this project
- [ ] I have performed a self-review of my own code
- [ ] I have commented my code, particularly in hard-to-understand areas
- [ ] I have made corresponding changes to the documentation
- [ ] My changes generate no new warnings
- [ ] I have added tests that prove my fix is effective or that my
feature works
- [ ] New and existing unit tests pass locally with my changes
- [ ] PR is being merged under a feature flag
#### QA activity:
- [ ] [Speedbreak
features](https://github.com/appsmithorg/TestSmith/wiki/Guidelines-for-test-plans#speedbreakers-)
have been covered
- [ ] Test plan covers all impacted features and [areas of
interest](https://github.com/appsmithorg/TestSmith/wiki/Guidelines-for-test-plans#areas-of-interest-)
- [ ] Test plan has been peer reviewed by project stakeholders and other
QA members
- [ ] Manually tested functionality on DP
- [ ] We had an implementation alignment call with stakeholders post QA
Round 2
- [ ] Cypress test cases have been added and approved by SDET/manual QA
- [ ] Added `Test Plan Approved` label after Cypress tests were reviewed
- [ ] Added `Test Plan Approved` label after JUnit tests were reviewed
> Pull Request Template
>
> Use this template to quickly create a well written pull request.
Delete all quotes before creating the pull request.
>
## Description
> Add a TL;DR when description is extra long (helps content team)
>
> Please include a summary of the changes and which issue has been
fixed. Please also include relevant motivation
> and context. List any dependencies that are required for this change
>
> Links to Notion, Figma or any other documents that might be relevant
to the PR
>
>
#### PR fixes following issue(s)
Fixes # (issue number)
> if no issue exists, please create an issue and ask the maintainers
about this first
>
>
#### Media
> A video or a GIF is preferred. when using Loom, don’t embed because it
looks like it’s a GIF. instead, just link to the video
>
>
#### Type of change
> Please delete options that are not relevant.
- Bug fix (non-breaking change which fixes an issue)
- New feature (non-breaking change which adds functionality)
- Breaking change (fix or feature that would cause existing
functionality to not work as expected)
- Chore (housekeeping or task changes that don't impact user perception)
- This change requires a documentation update
>
>
>
## Testing
>
#### How Has This Been Tested?
> Please describe the tests that you ran to verify your changes. Also
list any relevant details for your test configuration.
> Delete anything that is not relevant
- [ ] Manual
- [ ] JUnit
- [ ] Jest
- [ ] Cypress
>
>
#### Test Plan
> Add Testsmith test cases links that relate to this PR
>
>
#### Issues raised during DP testing
> Link issues raised during DP testing for better visiblity and tracking
(copy link from comments dropped on this PR)
>
>
>
## Checklist:
#### Dev activity
- [ ] My code follows the style guidelines of this project
- [ ] I have performed a self-review of my own code
- [ ] I have commented my code, particularly in hard-to-understand areas
- [ ] I have made corresponding changes to the documentation
- [ ] My changes generate no new warnings
- [ ] I have added tests that prove my fix is effective or that my
feature works
- [ ] New and existing unit tests pass locally with my changes
- [ ] PR is being merged under a feature flag
#### QA activity:
- [ ] [Speedbreak
features](https://github.com/appsmithorg/TestSmith/wiki/Guidelines-for-test-plans#speedbreakers-)
have been covered
- [ ] Test plan covers all impacted features and [areas of
interest](https://github.com/appsmithorg/TestSmith/wiki/Guidelines-for-test-plans#areas-of-interest-)
- [ ] Test plan has been peer reviewed by project stakeholders and other
QA members
- [ ] Manually tested functionality on DP
- [ ] We had an implementation alignment call with stakeholders post QA
Round 2
- [ ] Cypress test cases have been added and approved by SDET/manual QA
- [ ] Added `Test Plan Approved` label after Cypress tests were reviewed
- [ ] Added `Test Plan Approved` label after JUnit tests were reviewed
## Description
- Updated the workflows to save and download the correct dependencies
cache
#### Type of change
- Workflow changes
#### How Has This Been Tested?
- CI run
## Description
1. Move everything related to client from app folder to client folder
(`.yarn`, `yarn.lock`, package.json, .gitignore)
2. Move `ast` and `rst` to client packages
3. Fix running scripts in packages
4. Add running unit tests in packages in CI
TODO: It is necessary to consider enabling the `nmHoistingLimits:
workspaces` option, since now all packages are hoisted to the root,
there may be issues with dependencies in workspaces. Also, there is a
possibility of implicit use of packages.
https://yarnpkg.com/configuration/yarnrc#nmHoistingLimits
#### PR fixes following issue(s)
Fixes#23333
#### Type of change
- Chore (housekeeping or task changes that don't impact user perception)
## Testing
#### How Has This Been Tested?
- [x] Manual
- [x] Jest
- [x] Cypress
## Checklist:
#### Dev activity
- [x] My code follows the style guidelines of this project
- [x] I have performed a self-review of my own code
- [ ] I have commented my code, particularly in hard-to-understand areas
- [ ] I have made corresponding changes to the documentation
- [x] My changes generate no new warnings
- [ ] I have added tests that prove my fix is effective or that my
feature works
- [ ] New and existing unit tests pass locally with my changes
- [ ] PR is being merged under a feature flag
Co-authored-by: Valera Melnikov <melnikov.vv@greendatasoft.ru>
## Description
- This PR moves all specs from slim to fat container to run tests underneath it
- Fat has the actual libraries that are being shipping to customers, hence this PR
- Also includes moving Git tests from using GitHub to Gitea
## Type of change
- New run (non-breaking change which adds functionality)
## How Has This Been Tested?
- Cypress CI Fat runs
## Checklist:
### QA activity:
- [X] Test plan has been approved by relevant developers
- [X] Test plan has been peer reviewed by QA
- [X] Cypress test cases have been added and approved by either SDET or manual QA
- [X] Organized project review call with relevant stakeholders after Round 1/2 of QA
- [X] Added Test Plan Approved label after reveiwing all Cypress test
Co-authored-by: yatinappsmith <84702014+yatinappsmith@users.noreply.github.com>
## Description
- This PR removes the Upgrade workflow from being triggered in oktotest
## Type of change
- Yml Script fix (non-breaking change which fixes an issue)
## Description
- Appsmith Upgrade Test
## Type of change
- Cypress
## How Has This Been Tested?
- Cypress
## Checklist:
### QA activity:
- [ ] Test plan has been approved by relevant developers
- [ ] Test plan has been peer reviewed by QA
- [ ] Cypress test cases have been added and approved by either SDET or
manual QA
- [ ] Organized project review call with relevant stakeholders after
Round 1/2 of QA
- [ ] Added Test Plan Approved label after reveiwing all Cypress test
Co-authored-by: Aishwarya UR <aishwarya@appsmith.com>